Search Results (63 CVEs found)

CVE Vendors Products Updated CVSS v3.1
CVE-2021-2351 1 Oracle 111 Advanced Networking Option, Agile Engineering Data Management, Agile Product Lifecycle Management and 108 more 2026-08-25 8.3 High
Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced Networking Option. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Advanced Networking Option, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Advanced Networking Option. Note: The July 2021 Critical Patch Update introduces a number of Native Network Encryption changes to deal with vulnerability CVE-2021-2351 and prevent the use of weaker ciphers. Customers should review: "Changes in Native Network Encryption with the July 2021 Critical Patch Update" (Doc ID 2791571.1). CVSS 3.1 Base Score 8.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:C/C:H/I:H/A:H).
CVE-2021-45105 6 Apache, Debian, Netapp and 3 more 131 Log4j, Debian Linux, Cloud Manager and 128 more 2026-08-25 5.9 Medium
Apache Log4j2 versions 2.0-alpha1 through 2.16.0 (excluding 2.12.3 and 2.3.1) did not protect from uncontrolled recursion from self-referential lookups. This allows an attacker with control over Thread Context Map data to cause a denial of service when a crafted string is interpreted. This issue was fixed in Log4j 2.17.0, 2.12.3, and 2.3.1.
CVE-2019-10219 3 Netapp, Oracle, Redhat 198 Active Iq Unified Manager, Element, Management Services For Element Software And Netapp Hci and 195 more 2026-08-25 6.1 Medium
A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.
CVE-2020-10683 6 Canonical, Dom4j Project, Netapp and 3 more 44 Ubuntu Linux, Dom4j, Oncommand Api Services and 41 more 2026-08-25 9.8 Critical
dom4j before 2.0.3 and 2.1.x before 2.1.3 allows external DTDs and External Entities by default, which might enable XXE attacks. However, there is popular external documentation from OWASP showing how to enable the safe, non-default behavior in any application that uses dom4j.
CVE-2018-11039 3 Debian, Oracle, Vmware 33 Debian Linux, Agile Product Lifecycle Management, Application Testing Suite and 30 more 2026-08-25 5.9 Medium
Spring Framework (versions 5.0.x prior to 5.0.7, versions 4.3.x prior to 4.3.18, and older unsupported versions) allow web applications to change the HTTP request method to any HTTP method (including TRACE) using the HiddenHttpMethodFilter in Spring MVC. If an application has a pre-existing XSS vulnerability, a malicious user (or attacker) can use this filter to escalate to an XST (Cross Site Tracing) attack.
CVE-2021-44832 6 Apache, Cisco, Debian and 3 more 31 Log4j, Cloudcenter, Debian Linux and 28 more 2026-05-29 6.6 Medium
Apache Log4j2 versions 2.0-beta7 through 2.17.0 (excluding security fix releases 2.3.2 and 2.12.4) are vulnerable to a remote code execution (RCE) attack when a configuration uses a JDBC Appender with a JNDI LDAP data source URI when an attacker has control of the target LDAP server. This issue is fixed by limiting JNDI data source names to the java protocol in Log4j2 versions 2.17.1, 2.12.4, and 2.3.2.
CVE-2009-2625 8 Apache, Canonical, Debian and 5 more 18 Xerces2 Java, Ubuntu Linux, Debian Linux and 15 more 2026-04-23 N/A
XMLScanner.java in Apache Xerces2 Java, as used in Sun Java Runtime Environment (JRE) in JDK and JRE 6 before Update 15 and JDK and JRE 5.0 before Update 20, and in other products, allows remote attackers to cause a denial of service (infinite loop and application hang) via malformed XML input, as demonstrated by the Codenomicon XML fuzzing framework.
CVE-2020-36518 5 Debian, Fasterxml, Netapp and 2 more 49 Debian Linux, Jackson-databind, Active Iq Unified Manager and 46 more 2025-08-27 7.5 High
jackson-databind before 2.13.0 allows a Java StackOverflow exception and denial of service via a large depth of nested objects.
CVE-2025-50061 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-07-24 5.4 Medium
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.0-20.12.21, 21.12.0-21.12.21, 22.12.0-22.12.19, 23.12.0-23.12.13 and 24.12.0-24.12.4. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products (scope change). Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2024-21095 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-06-18 8.2 High
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 19.12.0-19.12.22, 20.12.0-20.12.21, 21.12.0-21.12.18, 22.12.0-22.12.12 and 23.12.0-23.12.2. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 8.2 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:N/UI:N/S:U/C:H/I:L/A:N).
CVE-2025-21558 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-06-18 5.4 Medium
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0 and 22.12.1.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products (scope change). Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2025-21528 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-06-18 4.3 Medium
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0, 22.12.1.0-22.12.16.0 and 23.12.1.0-23.12.10.0. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 4.3 (Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:N/UI:R/S:U/C:N/I:L/A:N).
CVE-2025-21526 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-06-18 5.4 Medium
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0, 22.12.1.0-22.12.16.0 and 23.12.1.0-23.12.10.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products (scope change). Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2017-3263 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-04-20 N/A
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Team Member). Supported versions that are affected are 8.2, 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS v3.0 Base Score 8.1 (Confidentiality and Integrity impacts).
CVE-2017-3503 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-04-20 N/A
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access (Apache Commons BeanUtils)). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploitable" vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 9.9 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:C/C:H/I:H/A:H).
CVE-2017-10160 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-04-20 N/A
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2017-10131 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-04-20 N/A
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 6.5 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:L).
CVE-2017-3583 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-04-20 N/A
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploitable" vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 8.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:N).
CVE-2017-3324 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-04-20 N/A
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.2, 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS v3.0 Base Score 10.0 (Confidentiality, Integrity and Availability impacts).
CVE-2017-3579 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2025-04-20 N/A
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploitable" vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).